1. Use case 2. Climate profile 3. Final specification

Step 3 — final specification

Smart-city climatology specification — Custom climate profile

Use case + climate profile = final specification. This version applies the smart-city climatology use case to the Custom climate profile climate profile.

use case fixedclimate profile fixedready to copy into tender docs
Use case
Smart-city climatology for digital twins and CFD inputs
Climate profile
Custom climate profile
What changes here
User-defined temperature limits, precipitation, and stressors.

How to use this page

Copy the clauses below into the tender document, then replace any bracketed placeholders with project-specific values, legal language, and approved thresholds.

Climate-adjusted requirement summary

Detailed specification clauses

Clause 1

Declared operating environment

The supplier shall declare that the proposed monitoring system is suitable for the stated use case and the Custom climate profile climate profile, including the environmental stressors listed in this specification.

Bidder evidence:
Environmental suitability declaration cross-referenced to station model, sensors, power system, enclosure, connectors, and mounting hardware.
Acceptance check:
Buyer verifies that the declared environment matches the project site and that no subsystem is excluded from compliance.

Clause 2

Environmental limits

The complete station shall meet the following minimum environmental limits: [buyer-defined minimum temperature] to [buyer-defined maximum temperature], [buyer-defined precipitation type], and [buyer-defined environmental stressors].

Bidder evidence:
Datasheets, environmental test reports, enclosure ratings, battery specifications, and any derating notes.
Acceptance check:
Submitted documents show compliance for the full assembled station, not just individual sensor elements.

Clause 3

Exposure-specific design measures

The supplier shall adapt enclosure design, materials, sealing, ventilation, drainage, grounding, and maintenance assumptions to the custom climate profile defined by the buyer.

Bidder evidence:
Mechanical drawings, materials list, connector details, protection measures, and maintenance instructions.
Acceptance check:
Review confirms that design measures are physically implemented and not merely optional accessories.

Clause 4

Acceptance evidence for this climate profile

The bidder shall submit evidence matched to the buyer-defined climate profile, with no unsupported claims or generic substitutions.

Bidder evidence:
Buyer-defined environmental evidence matched to the written custom profile.
Acceptance check:
Buyer confirms that the submitted evidence directly matches the claimed climate profile and operating range.

Need a different climate?

Go back to Step 2 and choose another climate profile to generate a different final specification for the same use case.

Back to Step 2: Climate profiles